P00012 RAAF Base Townsville AIR 7000 2B MPAR Sep 2025
Engaged by Fulton Hogan, we continue our relationship with RAAF Townsville upgrading their existing AGL system. This is a major...
SACL AGL Preventative and Corrective Maintenance
Avionics currently complete all Preventative and Corrective Maintenance on Sydney Airport (since 2015), Australia’s largest. We have now divisionalised Maintenance, with specific expertise in this area managing the process.
Avionics are now filling the gap for major airports whom are struggling to keep up with corrective maintenance requirements on the airfield. Our systems and quality assurance will ensure your airfield lighting remains compliant
Engaged by Fulton Hogan, we continue our relationship with RAAF Townsville upgrading their existing AGL system. This is a major...
Avionics have Joint Ventured this Project with ADB Safegate. Avionics will complete all major AGL infrastructure and on pavement AGL installation. The project...
Avionics engaged by Downer to complete an important overlay upgrade at Mackay Airport. The project includes the removal of existing...
Avionics were engaged by Downer to complete 3 High Mast Lighting positions complete with ewo LED lighting in mid 2025. ...
Engaged in March 2024 by Fulton Hogan, Avionics were preferred to complete all the AGL Infrastructure and on pavement cannister...
The Department of Defence (DoD) National Airfield Works Program is a 10-year rolling Airfield Capital Works maintenance program which encompasses...
Taxilane DOM2 and Taxilane DOM 3 are critical pavements servicing many of the Domestic Terminal aircraft parking aprons. These pavements...
The scope of this project includes all works associated with the temporary removal and reinstallation, of the existing AGL as...
The existing runway and taxiway surfaces have been servicing Adelaide Airport since 2010/2011 and are now due for maintenance to...
Avionics supply a wide range of Quality Aeronautical Ground Lighting Components from reputable high end companies including: